2008 Projects

Fer Sure

  • Finish refinishing/replacing baseboards (half-done)
  • Have bathroom retiled
  • Restore window and door frames in bathroom
  • Restore wooden door frames throughout first floor
  • Install crown molding in main rooms
  • Install a hood above the stove
  • Get curtains that show off the living- & dining-room windows
  • Paint exterior soffits and fascia to match windows
  • Rebuild fireplace and built-in bookcases
  • Properly insulate the attic
  • Replace the leaking, rotting attic window

Fer Maybe

  • Restore double-hung windows throughout the house
  • Rebuild chimney
  • Install a dishwasher
  • Install plate rail in main rooms
  • Strip and refinish two back doors
  • Finish Jef’s studio in the attic